PUBLIC WORKS
STUDENT TEACHER LEARNING CENTER
AT BAY D
McClellan, CA
Renovation of an existing, 21,411 square feet former military building into a new videography and broadcasting Student Learning Center for the Twin Rivers Unified School District. Tricorp Group installed high-end finishes and technology such as cyclorama walls, partition Nanawalls, interactive display boards, and ceiling mounted cameras, speakers, and projectors.
Construction: Adaptive Re-Use
Size: 21,411 square feet
Owner: Twin Rivers Unified School District
Architect: PBK Architects

UC DAVIS SCHAAL AQUATIC CENTER
Davis, CA
Design/Build construction of a new Coaches’ Offices and Team Room Building. Project consists of an office building with large meeting room and offices. Tricorp led the Design/Build team including architect, engineers and Design/Build consultants and contractors. Tricorp coordinated its design with UC Davis to ensure full adherence to Campus Design Standards and user group requirements.
Construction: VA/VB
Size: 3,400 square feet
Owner: The Regents of the University of Calif.
Architect: HRGA

UC DAVIS ROBERT MONDAVI WINE INSTITUTE
ENVELOPE REPAIR
Davis, CA
Construction consisted of removal and repair of exterior and interior finishes due to water intrusion of the three buildings that comprise the Robert Mondavi Wine Institute. Exterior work includes removal and replacement of parapet coping, plywood sheathing, waterproofing assemblies and new elastomeric coating. Interior scope includes new sheetrock, paint, and removal and replacement of existing carpet. Classes remained in session throughout construction.
Construction: Renovation/Remediation
Size: 3,400 square feet
Owner: The Regents of the University of Calif.
Architect: Simpson Gumpertz & Heger, Inc.

CALPERS HEADQUARTERS
Sacramento, CA
Select post-occupancy work. Six-story and four-story existing office buildings consist of towers and a parking garage. Project includes select restack projects to remodel and repurpose occupied spaces. Tricorp also finished the site work including hardscape and landscape work.
Construction: Tenant Improvement
Size: 987,094 square feet
Owner: CalPERS
Architect: Dreyfuss & Blackford

LINCOLN PLAZA
Sacramento, CA
Removal of existing planting and waterproofing, new irrigation, new planting soil and plants, sterilization of surfaces, 44 concrete curbs, removal and replacement of 7,374 square feet of existing waterproofing, 1,229 linear feet of new stainless steel flashing, removal and re-installation of glass panels, and replacement of 2,864 square feet of cement board. Work was performed exclusively on weekends as the building remained open during the week. Since renovations were performed along the edge of the atrium mezzanines up to 5 stories high, all workers had to be tied off while working.
Construction: Tenant Improvement
Owner: CalPERS
Architect: WJE Architects

CALIFORNIA STATE CAPITOL RENOVATION
Sacramento, CA
Re-roof of the historical California State Capitol and replacement of mechanical roof units. Project also included interior renovation, new steel catwalk at the rotunda while the Capitol was in session.
Construction: Roofing and Tenant Improvement
Size: 90,000 square feet
Owner: The State of California DGS
Architect: HMR Architects

UC DAVIS TERCERO 3 ENVELOPE REPAIR
Davis, CA
Rehabilitation of water damage at windows and exterior skin on existing student housing. Replacement of windows, flashing and waterproofing at each window, drywall and stucco around windows where damaged by mold. Replaced sheet metal cap and coping at parapet cap. Repaired roof at elevations where stucco repair was performed. Some of the work was performed while classes were in progress, and work was on a tight schedule dependent on student occupancy.
Construction: Water Intrusion and Envelope Repair
Size: 4 buildings, 3 stories
Owner: The Regents of the University of Calf.
Architect: Blackbird Associates, Inc.